Metro Americas
Menu
  • Metro Profiles
    • Metrô Rio
  • North America
    • Canada
    • Mexico
    • United States
  • Central America
    • Costa Rica
    • Honduras
    • Nicaragua
    • Panama
  • South America
    • Argentina
    • Bolivia
    • Brazil
    • Chile
    • Colombia
    • Ecuador
    • Paraguay
    • Peru
    • Uruguay
    • Venezuela
  • Carribbean
    • Dominican Republic
    • Cuba
    • Puerto Rico
  • Technology Partners
    • Teltronic
    • PowerTrunk
    • Frauscher Sensor Technology
Menu
  • Metro Americas
    • What do we do?
    • ¿Qué Hacemos?
    • Linkedin
  • Technology Partners
    • Frauscher Sensor Technology
    • PowerTrunk
    • Teltronic
  • News
  • Events
  • Project Profiles
  • English
  • Español
  • Português

Project Profiles

Metrô Rio

Metrô Rio is a mass-transit underground railway network that serves the city » read more

São Paulo: Línea 15 Proyecto de Monorriel

Paulo Sergio Amalfi Meca, jefe de construcción en la Companhia do Metropolitano de » read more

Metrô Rio Expansion and Modernization

Head of Planning and Development Cristian Mendonça provides a detailed overview of » read more

The Lao Railway Project

Somsana Ratsaphong, CEO of the Lao Railway Authority (LRA), provides detailed insight » read more

Peru prepares $30,000 million infrastructure investment

The confirmation of Lima as the host of the 2019 Pan American » read more

Metro de Santiago Actualizaciones 2013

Con la entrada en funcionamiento del último de los 14 nuevos trenes » read more

Medellin Monorail Project: EDU Confident of Private Investment

The Urban Development Corporation (EDU) are now looking for private investment as » read more

Browse: Home   /   sbase
SBASE avanza con la modernización y el reemplazo de escaleras mecánicas de la red

SBASE avanza con la modernización y el reemplazo de escaleras mecánicas de la red

December 6, 2016
Simon Edwards
Argentina

Subterráneos de Buenos Aires S.E. (SBASE) informa que avanza con la renovación y el reemplazo de 31 escaleras mecánicas obsoletas de las líneas C, D y E, a fin de mejorar la circulación en las estaciones y brindar un servicio de mayor calidad a los usuarios. La iniciativa comprende la modernización integral de 4 equipos y el reemplazo de otros 27 por escaleras nuevas.

Read Article →
Avanzan grandes obras de infraestructura para el mantenimiento de la flota

Avanzan grandes obras de infraestructura para el mantenimiento de la flota

September 23, 2016
Simon Edwards
Argentina, Español, News, South America

En el marco del Plan de Infraestructura, Subterráneos de Buenos Aires S. E. (SBASE) informa que avanza con diferentes obras en cocheras y talleres, donde diariamente se realizan las tareas de mantenimiento de las formaciones, a fin de garantizar su buen estado y disponibilidad. Asimismo, la construcción, readecuación y ampliación de talleres y cocheras es fundamental para las revisiones generales de la flota, que deben realizarse cada 600 mil km.

Read Article →
SBASE lanzará una obra para mejorar la accesibilidad y el trasbordo debajo del Obelisco

SBASE lanzará una obra para mejorar la accesibilidad y el trasbordo debajo del Obelisco

September 19, 2016
Simon Edwards
Argentina, Español, South America

Subterráneos de Buenos Aires S. E. (SBASE) lanzará el Plan de Accesibilidad, Circulación y Evacuación 9 de Julio, para mejorar el trasbordo de los 300 mil usuarios que transitan por día en el nodo de combinación de las líneas B, C y D. Se trata de una obra fundamental, ya que es una de las zonas de la red de mayor confluencia de pasajeros, y permitirá dotar de accesibilidad a las estaciones Carlos Pellegrini (Línea B), 9 de Julio (Línea D) y Diagonal Norte (Línea C).

Read Article →
Subtes: desde 2013, aumentó un 20% la cantidad de pasajeros diarios

Subtes: desde 2013, aumentó un 20% la cantidad de pasajeros diarios

September 8, 2016
Simon Edwards
Argentina, Español

Subterráneos de Buenos Aires S.E. (SBASE) informa que, este año, se incrementó un 20% la cantidad de pasajeros transportados en comparación con 2013, año en que la Ciudad se hizo cargo del subte. Y es que, desde hace tres años, se abrieron nuevas estaciones, se incorporó material rodante y se realizaron obras fundamentales para mejorar la calidad del servicio y la experiencia del usuario, que se tradujeron en un incremento de 200 mil usuarios por día hábil.

Read Article →
SBase: First Chinese Cars Arrive in Buenos Aires

SBase: First Chinese Cars Arrive in Buenos Aires

February 6, 2015
Simon Edwards
Argentina, English, News, South America

Buenos Aires Subway (SBase) has welcomed the arrival of the first of a batch of 105 new cars from China, which will include air conditioning and greatly increase capacity of Line A. The new rolling stock are stainless steel, have four doors, are equipped with onboard security cameras and can accommodate 133 passengers.

Read Article →
Subte: Line F Project to Be Driverless and Fully Automated

Subte: Line F Project to Be Driverless and Fully Automated

November 25, 2014
Simon Edwards
Argentina, English, News, South America

Juan Pablo Piccardo, General Manager of SBASE, has confirmed that Line F of the Argentine capital’s subterranean rail network will be fully automated and transport 500,000 passengers per day with construction of stage one scheduled for 2017.

Read Article →
SBASE Instala Terminales Interactivas

SBASE Instala Terminales Interactivas

December 20, 2013
Harold Palacio
Argentina, Español, News, South America

La empresa Sbase instaló terminales en la línea B que permiten realizar de forma rápida y sencilla sugerencias y reclamos referidos al servicio de subte…

Read Article →
Extensión del Subte finalmente listo para prestar servicio

Extensión del Subte finalmente listo para prestar servicio

September 23, 2013
Simon Edwards
Argentina, Español, News, South America

La demorada extensión del subte A hacia el corazón de Flores finalmente se hará realidad: según la agenda que manejan el gobierno de la ciudad…

Read Article →
Subte replace 'the oldest rolling stock in the world'

Subte replace ‘the oldest rolling stock in the world’

September 10, 2013
Simon Edwards
Argentina, English, News, South America

Subterráneos de Buenos Aires (SBASE) today announced the modernization of 70% of its fleet of rolling stock, purchasing 402 new cars and upgrading 300 current…

Read Article →
SBASE actualizar 70% de su flota de material rodante

SBASE actualizar 70% de su flota de material rodante

September 10, 2013
Yureizy Alexandra Pino medrano
Argentina, Español, News, South America

Subterráneos de Buenos Aires (SBASE) anunció hoy que renovarán el 70 por ciento de las formaciones, luego de comprar 402 coches y comenzar las tareas…

Read Article →
1 2 Next →

Noticias en Español

Subtes: desde 2013, aumentó un 20% la cantidad de pasajeros diarios

Subterráneos de Buenos Aires S.E. (SBASE) informa que, este año, se incrementó un 20% la cantidad de pasajeros transportados en » ler más

Siemens suministrará sistema de tranvías para San Francisco

El 19 de septiembre Siemens anunció que había adjudicado un contrato de $648m para la Agencia de Transporte Municipal de » ler más

Metro de Panamá autoriza compra de vagones para la línea 1

Ante el creciente aumento de la cantidad de pasajeros que utilizan la Línea 1 del Metro de Panamá, que ya » ler más

Metro de Quito arrancó con la segunda fase de los estudios de contaminación subterránea para la línea uno

Metro de Quito arrancó con la segunda fase de los estudios de contaminación subterránea en el trazado de la Primera » ler más

El medio de transporte favorito de Ámsterdam

Así muchos no lo creamos el medio de transporte que los Amsterdaneses aman es la bicicleta y podríamos ver y » ler más

MPPTOP y Yutong certificaron funcionamiento de sistemas del Metro de Maracaibo

Representantes del Ministerio del Poder Popular para Transporte y Obras Públicas (MPPTOP) y las empresas chinas Yutong y TCPS realizaron » ler más

Artistas nacionales e internacionales pintan alrededores del metro de Medellín

Arte colorido llegó a las columnas del Metro de Medellín en el tramo entre las estaciones Universidad y Prado. Todo, » ler más

Lima: Extensión se completará en Abril

El segundo tramo de la Línea 1 del Metro de Lima tiene grado de construcción del 78 % y sus » ler más

METRO AMERICAS

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org

Copyright © 2019

Powered by Oxygen Theme.

  • English
  • Español
  • Português